Skip to main content
Commercial Masonry Restoration in Boynton Beach by Anthony Pennacchi & Sons
Boynton Beach, Florida

Commercial Masonry Restoration in Boynton Beach

Boynton Beach's Ordinance 22-025, modeled on Miami-Dade's recertification program, extends the 25-year recertification requirement to all Threshold buildings, including qualifying commercial structures. assessment, fixed-price proposal.

75+
Years
3,000+
Projects
4th
Generation
24/7
Emergency

FL License CGC1538576 · Fully insured · No-pressure quote

By Anthony Pennacchi & Sons Team·Reviewed by Paul Pennacchi, Owner · 4th Generation·Last updated: April 2026

Quick Answer

  • Engineer-of-record-ready: contractor docs, material data sheets, methodology specs.
  • Phased scopes that keep tenants in place and parking decks operational.
  • on-site assessment plus fixed-price written proposal. Call (561) 475-0775.

The Boynton Beach Difference

What You Get When You Call Pennacchi

Six reasons Boynton Beach owners trust us with their masonry.

Featured
75+
Years · 4 Generations

Family-Built Since 1947

Four generations of commercial masonry, concrete, and waterproofing restoration. The Pennacchi name has carried the same standard since before most of South Florida commercial stock existed.

3,000+ Projects Completed

Commercial, residential, historic, and industrial restoration across Florida, New Jersey, New York, and Pennsylvania.

Recertification Documentation

Our licensing + reporting satisfies Palm Beach County and city-level recertification requirements (Miami-Dade 40-year, Boca Ordinance 5589, Boynton 22-025).

Certified Jahn Applicators

Material-compatible repair on Mizner-influenced, historic, and architecturally protected commercial structures.

Local Palm Beach Office

2875 South Ocean Blvd., Suite 200-18, Palm Beach. Close to every commercial corridor in Palm Beach County.

Engineer-Coordinated Scopes

We coordinate directly with the engineer of record so the repair plan, methodology, and completion docs align with what the city requires.

See for yourself

Why Restoration Over Replacement

Why This Makes Sense For Boynton Beach Owners

Tap any reason to expand.

Restoration at the right stage of deterioration costs a fraction of structural failure and full replacement.

A spalling parking deck or cracked facade signals deferred maintenance before a tenant meeting begins. Restoration restores the building's professional character alongside its structural integrity.

Commercial valuations reflect maintenance history. Deferred concrete repair creates a documented liability that buyers and lenders price into any transaction.

Threshold buildings require recertification on strict schedules. Having the right licensed contractor in place before inspection reduces re-inspection cycles and delays.

On barrier island properties, unchecked chloride infiltration progresses from surface spalling to structural steel corrosion. Restoration stops that progression at whatever stage it is caught.

We provide the contractor's affidavit, material data sheets, and completion records the structural engineer of record needs to file with the building department.

Catch It Early

Six Signs Your Masonry Needs Attention

Boynton Beach buildings approaching the 25-year recertification threshold often reveal long-deferred concrete and waterproofing failures during inspection.

Chunks of concrete breaking from columns, beams, parking deck soffits, or balcony undersides indicate advanced corrosion pressure already at work.

Random intersecting cracks across a deck or facade panel suggest widespread deterioration of the concrete matrix that needs engineered assessment.

Orange or brown streaks beneath elevated decks or balconies confirm that reinforcing steel is actively corroding and expanding.

A section of parking deck or plaza that rings hollow has separated from the substrate. Under vehicle loads, this fails suddenly.

Rebar visible on columns, beams, or foundation walls indicates advanced deterioration that threatens structural capacity.

Open joints at window perimeters and expansion joints allow water into the envelope, driving facade staining, interior damage, and accelerated deterioration.

Seeing any of these signs at your Boynton Beach property?

on-site assessment. Fixed-price written proposal.

Call (561) 475-0775

What We Restore

Surfaces We Repair At Boynton Beach Properties

Pool decks to foundation walls. Every primary commercial masonry surface.

Parking Decks And Garages

High demand

Elevated parking structures face salt-air chloride exposure, vehicle load cycling, and drainage saturation. We restore deck integrity, apply traffic coatings, and replace failed expansion joints.

Building Facades And Exterior Walls

Spalling concrete facades, stucco cracking, and EIFS failure on commercial office buildings. On Mizner-influenced or architecturally protected facades, Jahn mortar restoration.

Balconies, Catwalks, And Walkways

Recert-critical

Balcony soffit spalling, failed fascia concrete, and railing embedment corrosion on multi-story commercial and condo buildings.

Columns, Beams, And Structural Elements

Load-bearing column spall repair, beam soffit restoration, and structural crack injection on commercial building frames.

Plaza Decks And Podium Slabs

Waterproofed plaza decks over occupied space require both structural repair and restored membrane integrity.

Stairwells And Entry Features

Concrete stair treads, landings, and entry plaza surfaces where appearance and slip resistance both matter.

Technical Methods

How We Actually Do The Work

The details that separate a 30-year repair from one that fails next wet season. Click any method to see how it works in Boynton Beach conditions.

Method 01 of 06

Spall Repair On Structural Elements

SpecPolymer-modified mortar

Commercial spall repair follows a more demanding sequence than residential because the affected elements often carry load and recertification inspections require documentation. Spalled sections are mapped, tested for delamination depth, and removed to clean, chloride-free concrete. Polymer-modified repair mortars are applied in correctly profiled lifts with full surface preparation and mechanical bonding profile.

Materials We Specify

Built For South Florida Exposure

A repair mortar that performs in a northern state may fail within a year in Boynton Beach. We specify based on the conditions each surface actually faces.

M01

Polymer-Modified Repair Mortars

Structural spall repair

Bond strength, chloride resistance, and surface profile compatibility that commercial spall repairs require. Specified with the compressive strength, flexural bond, and chloride diffusion data engineering reports request.

M02

Epoxy & Polyurethane Injection Resins

Structural cracks

Epoxy for dormant structural cracks. Low-modulus polyurethane for active and water-transmitting cracks. Both specified with elongation and compressive data appropriate for the element type.

M03

Traffic-Grade Waterproof Coatings

Parking + plaza

High-build traffic coatings with aggregate broadcast. Waterproofing, UV resistance, and slip-rated surfaces for parking decks, plazas, and pedestrian walkways.

M04

Silane-Siloxane Penetrating Sealers

Below-surface chloride block

Prevent re-entry of chlorides into restored concrete elements. Specified at the appropriate silane content for the concrete porosity of the element being treated.

M05

Jahn Restoration Mortars

Period-compatible

Used on Mizner-influenced commercial facades, historic structures, and any building where the city's design standards require material compatibility with the original construction.

Our 6-Step Process

From First Call To Final Walkthrough

Every project follows the same disciplined sequence. No improvising, no shortcuts.

01
Day 1

On-Site Assessment

We inspect every affected element, perform delamination mapping, depth testing, and substrate evaluation. For recertification properties, we review the engineer's deficiency report alongside our findings.

02
Within 1 week

Written Scope And Fixed-Price Proposal

Written scope with a fixed price. For recertification scopes, includes material specs, mix designs, and methodology that the building department and the engineer of record require.

03
Pre-mobilization

Pre-Construction Coordination

Coordinate with property managers, HOA boards, building engineers, and tenants. Phasing plans, parking deck traffic management, and tenant communication established before site mobilization.

04
Day 1 of work

Surface Preparation

All deteriorated and chloride-contaminated concrete removed to the correct depth before any repair material is introduced. The step that determines whether the repair holds for the life of the building.

05
Main scope

Repair And Restoration

Repair mortars, injection resins, traffic coatings, waterproofing membranes, and sealers applied in correct sequence. We provide contractor's affidavit, material data sheets, and completion docs for recertification scopes.

06
Close-out

Final Inspection And Documentation

We walk every restored element with the property manager before close-out. On recertification scopes, we provide the written completion documentation the engineer of record needs to file with the city.

The Honest Answer

Restoration Vs Replacement

Some contractors push replacement because it generates a larger contract. We do not. Here is the head-to-head.

Recommended

Restoration

What we recommend in the majority of cases we assess in Boynton Beach.

Typical cost
Fraction of replacement
Disruption to occupants
Phased; building stays operational
Time to complete
Weeks for most commercial scopes
Recertification posture
Strengthens compliance record
Best for
Spalling, cracking, joint failure, facade deterioration
Asset value impact
Preserves and improves valuation
Last resort

Replacement

When the substrate is gone or the structure is past saving.

Typical cost
Full structural rebuild
Disruption to occupants
Significant; partial or full vacancy
Time to complete
Months including engineering
Recertification posture
Resets full inspection cycle
Best for
Total structural failure or unsuitable substrate
Asset value impact
Major capex with long ROI horizon

We give you a straight answer after the assessment, not after looking at the size of the contract.

Why Choose Us

Six Reasons Boynton Beach Owners Pick Pennacchi

The credentials, the people, the standard. Why Pennacchi, in six.

01
4 Generations · 1947

4th-Generation Commercial Experience

We have been restoring commercial concrete and masonry for longer than most of South Florida's commercial building stock has existed.

02
Engineer-ready

Recertification Documentation Capability

We understand the city recertification ordinances (Miami-Dade 40-year, Boca 5589, Boynton 22-025) and the repair plan submission requirements they create.

03
Palm Beach

Local Office, Not A Franchise

2875 South Ocean Blvd., Suite 200-18, Palm Beach. Every commercial corridor in Palm Beach County is within close reach.

04
Jahn Certified

Jahn Applicator Certification

Where commercial facades involve Mizner-era or architecturally protected construction, our Jahn certification is the credential that makes it achievable.

05
Honest

Transparent Assessments

We assess properties on what the structure actually shows. If restoration will hold and deliver lasting value, we document it. If it will not, we say so and explain why.

06
3,000+

Projects Across Four States

Residential, commercial, historic, and industrial restoration across Florida, New Jersey, New York, and Pennsylvania.

Our reputation is the only thing we will never restore if we damage it.

Frequently Asked

Boynton Beach Masonry Restoration FAQ

The questions Boynton Beach owners ask most. Tap any to expand.

When water infiltrates a failed mortar joint and the wetting and drying cycles that follow break down the mortar behind it, moisture reaches the masonry unit and, on reinforced structures, the steel embedded within. On a Boynton Beach commercial building that has been accumulating Atlantic chloride exposure from the east side of Federal Highway since the late 1990s, that process is often at an advanced stage before Ordinance 22-025 triggers the formal inspection. Commercial masonry restoration addresses those failures using materials matched to the original construction and documented to the standard the city's Building Department and the engineer of record require for compliance submission under the ordinance.

4th-generation commercial masonry craftsmanship since 1947. The diagnostic depth and material knowledge built across 75+ years of commercial masonry work in South Florida are not replicated by a contractor that started recently. Reading an Ordinance 22-025 Phase Two deficiency report, specifying the correct remediation scope, and delivering the documentation that closes findings with the city requires experience that cannot be acquired quickly.

Share the Phase One or Phase Two deficiency report with us before the site assessment. We review every deficiency line item, scope the commercial masonry restoration work to address each finding directly, and provide material data sheets, mix design references, and contractor methodology documentation for the structural engineer of record. At close-out we deliver written contractor affidavits and completion documentation for submission to Boynton Beach's Building Department. The Phase Two repair plan and schedule must be submitted within 180 days of the Phase One report, and we structure the scope to meet that window from the first proposal.

The statewide Milestone Inspection Law applies only to condominiums and cooperatives. Ordinance 22-025 is Boynton Beach's own local program, modeled on Miami-Dade County's long-standing recertification structure, and it extends the 25-year recertification requirement to all Threshold buildings within city limits, which includes qualifying commercial structures. That means commercial building owners in Boynton Beach are not simply subject to the condo-focused statewide law. They are subject to a separate local ordinance with its own zone-based inspection priority schedule, its own Phase One and Phase Two submission requirements, and its own enforcement consequences, including citation under the city's Unsafe Structures provisions for non-compliance.

Yes. Sequencing restoration work around occupied Federal Highway retail tenants, Congress Avenue commercial occupants, and active Quantum Park office buildings is standard practice for our team. We develop phasing plans with property managers and building owners before mobilization so that access to critical building areas is maintained throughout the scope. For Zone 1 east-of-Federal-Highway properties where the inspection priority schedule is most immediate, we also account for the Ordinance 22-025 Phase Two submission timeline in the phasing plan from the outset.

Yes on both counts. Commercial masonry repair work in Boynton Beach requires a building permit, and both Florida law and Ordinance 22-025 require the work to be performed by a licensed contractor. On recertification compliance scopes, the permit is part of the documentation chain that leads to Boynton Beach's Building Department accepting the remediation as closing the deficiency finding and issuing the recertification certificate. We carry full licensure and insurance on every commercial project we take on. Permit documentation requirements are set by the jurisdiction.

Ready to start?

Get Your Assessment In Boynton Beach

If your property is showing signs of masonry deterioration, the right time to have it assessed is before the damage reaches the reinforcing steel. No-obligation on-site assessments throughout Boynton Beach and Palm Beach County.

Anthony Pennacchi & Sons · 2875 South Ocean Blvd., Suite 200-18, Palm Beach, FL · FL License CGC1538576